Use case

Lact' Union

VMware capacity planning: measure and optimize your infrastructure resources

Industry | France
logo Lac Union

Installed solution

DC Scope®
picto 13 EasyVirt

Context

  • Lactinov: 3 plants located in the Hauts de France region
  • Lact’Union: 400 collection points, 45 dairy drivers, 410 employees
  • Group committed to CSR
  • 2023: 2018 carbon footprint update with 2022 data
  • Act pas à pas” collective initiative to reduce environmental footprint
  • Need for capacity planning over a 6-month period to assess the feasibility of several projects
  • A 68 VM farm
picto 19 EasyVirt

Implemented solution

  • DC Scope® installation
  • Quarterly VMware capacity planning to anticipate resource requirements. This allows you to optimize your infrastructure by planning the necessary upgrades to meet growing demand.
  • Monthly VM performance audit to ensure optimal infrastructure MCO. This enables the necessary measures to be taken to guarantee optimum performance.
picto 24 EasyVirt

Results

  • Gains and problems avoided:
    Out of 68 VMs: 3 VMs removed, 3 VMs stopped
    21 vCPUs freed up
    Release of 82 GB RAM
  • VMware capacity planning analysis reveals short-term storage limitation, infra upgrade triggered and project deadlines met
picto 20 EasyVirt

Why EasyVirt ?

  • Efficiently plan and optimize resources, while ensuring the smooth running of our infrastructure
  • Relevant information presented in clear, precise graphs and dashboards, facilitating decision-making

I test
DC Scope® solution for free